Concrete Calculator
Inputs
Units
Estimate only. Verify quantities against the structural drawings and order a small buffer - running short mid-pour is far more expensive than extra yardage.
Results
Concrete needed
5.43 cu yd
146.7 cubic feet
Estimated cost
$869
Ready-mix, material only
60 lb bags
326
80 lb bags
245