    Concrete Calculator

    Estimate concrete volume, bag counts, and ready-mix cost for slabs, footings, and columns in imperial or metric units.

    Inputs

    Units

    Estimate only. Verify quantities against the structural drawings and order a small buffer - running short mid-pour is far more expensive than extra yardage.

    Results

    Concrete needed
    5.43 cu yd
    146.7 cubic feet
    Estimated cost
    $869
    Ready-mix, material only
    60 lb bags
    326
    80 lb bags
    245
    Track materials on the jobsite

    How much concrete do I need?

    Multiply length x width x thickness in feet and divide by 27 to get cubic yards. A 10 x 10 ft slab at 4 in. thick is 33.3 cubic feet, or 1.24 cubic yards - order 1.35 yards with 10% waste.

    In bags, that same slab takes about 74 sixty-pound bags or 56 eighty-pound bags. Past roughly 1 cubic yard, ready-mix is cheaper and far faster than bagged mix.

    How this concrete calculator works

    Volume is length x width x thickness for slabs and footings, and pi x radius squared x height for round columns. Cubic feet are divided by 27 to get cubic yards, the unit ready-mix is sold in. Switch the unit toggle to metric and the same math returns cubic meters instead - your entered dimensions convert automatically.

    Bag counts use standard yields: a 60 lb bag of concrete mix yields about 0.45 cubic feet and an 80 lb bag about 0.60 cubic feet. In metric, a 20 kg bag yields roughly 0.0093 m³ and a 40 kg bag about 0.0186 m³. Bagged mix is practical up to roughly 1 cubic yard (0.75 m³) - past that, ready-mix is cheaper and faster.

    Common slab thicknesses

    • 4 in (10 cm) - sidewalks, patios, residential slabs
    • 5-6 in (13-15 cm) - driveways and light vehicle traffic
    • 6-8 in (15-20 cm) - heavy equipment, shop floors, and loading areas

    Add 5-10% waste for spillage, uneven subgrade, and over-excavation. Most suppliers have a short-load fee, so ordering slightly long is usually the cheaper mistake.

    Concrete bag yields

    BagYieldBags per cubic yard
    40 lb0.30 cu ft90
    60 lb0.45 cu ft60
    80 lb0.60 cu ft45
    20 kg0.0093 m3108 per m3
    40 kg0.0186 m354 per m3

    Slab coverage by thickness

    ThicknessSq ft per cubic yard
    4 in (10 cm)81 sq ft
    5 in (13 cm)65 sq ft
    6 in (15 cm)54 sq ft
    8 in (20 cm)40 sq ft

    Typical concrete strength by use

    ApplicationStrength
    Sidewalks and patios3,000 psi (20 MPa)
    Residential slabs and driveways3,500 - 4,000 psi (25-28 MPa)
    Footings and foundation walls3,000 - 4,000 psi (20-28 MPa)
    Shop floors and heavy equipment pads4,500 psi+ (30 MPa+)

    Worked example: 20 x 24 ft garage slab, 5 in thick

    1. Area: 20 x 24 = 480 sq ft.
    2. Thickness in feet: 5 / 12 = 0.417 ft.
    3. Volume: 480 x 0.417 = 200 cu ft.
    4. Cubic yards: 200 / 27 = 7.41 yd3.
    5. Add 10% waste: 8.15 yd3.

    Order 8.25 cubic yards of ready-mix. Bagged mix would take about 445 eighty-pound bags, which is why ready-mix wins at this size.

    Frequently asked questions

    How do I calculate cubic yards of concrete?

    Multiply length x width x thickness in feet to get cubic feet, then divide by 27. A 20 ft x 10 ft slab at 4 inches thick is 20 x 10 x 0.333 = 66.7 cubic feet, or about 2.5 cubic yards before waste.

    How many bags of concrete are in a cubic yard?

    About 45 bags of 80 lb mix, 60 bags of 60 lb mix, or 90 bags of 40 lb mix per cubic yard. Bagged mix is practical up to roughly 1 cubic yard - past that, ready-mix is cheaper and faster.

    How much extra concrete should I order?

    Add 5-10% for subgrade irregularities, spillage, and over-excavation. Footings on soft ground often need more. Being short mid-pour creates a cold joint, so it is cheaper to over-order slightly.

    How thick should a concrete slab be?

    Four inches is standard for patios, walkways, and residential floors. Use 5-6 inches for driveways and anywhere vehicles or equipment will park, and follow the engineer's drawings for structural slabs.

    How much does a yard of concrete cost?

    Ready-mix commonly runs $140-$200 per cubic yard delivered in the US, plus short-load fees under about 5 yards. Enter your local quoted rate above to get a project-specific cost.

    Does this concrete calculator work in metric?

    Yes. Switch the unit toggle to metric and dimensions convert to meters with results in cubic meters, so you can estimate ready-mix in m3 as well as cubic yards.

    Embed this calculator on your site - free

    Paste this into any blog post or page. The widget resizes itself, needs no signup, and always shows the latest version. The only condition: keep the credit link to DailyBuild intact.

    <iframe
      src="https://dailybuild.co/embed/concrete-calculator"
      title="Concrete Calculator by DailyBuild"
      width="100%"
      height="720"
      style="border:0;width:100%;max-width:100%;"
      loading="lazy"
      scrolling="no"
    ></iframe>
    <p style="font-size:13px;margin-top:8px;">
      <a href="https://dailybuild.co/concrete-calculator" target="_blank" rel="noopener">Concrete Calculator</a> by
      <a href="https://dailybuild.co" target="_blank" rel="noopener">DailyBuild</a>
    </p>
    <script src="https://dailybuild.co/embed.js" async></script>

    Preview the widget: https://dailybuild.co/embed/concrete-calculator

    Track every material order in DailyBuild

    Log materials, photos, and daily progress from the field in minutes.

    Start Free Trial