    Construction Glossary

    Plain-English definitions of the documentation, contract, safety, and schedule terms that show up on every jobsite.

    Field documentation

    Daily report
    A dated record of what happened on a jobsite: crews and hours on site, work performed, weather, materials delivered, equipment used, visitors, delays, and photos. It is the primary evidence in delay claims and change order disputes, and most owner contracts require one for every working day. Daily report guide.
    Daily log
    Another name for a daily report. Some contracts use 'daily log' for the superintendent's running notes and 'daily report' for the formal document issued to the owner, but in most software the two terms are interchangeable.
    Delay log
    A record of every event that stopped or slowed work, with the date, cause, duration, crews affected, and supporting photos. Delay logs are what turn a schedule impact into a compensable claim. Free delay log template.
    Punch list
    The list of incomplete or defective items that must be corrected before a project is accepted as substantially complete. Each item names a location, a responsible party, and ideally before and after photos. Free punch list template.
    T&M tag
    A time and materials tag: a signed field ticket recording labor hours, equipment, and materials used on work performed outside the contract scope. Signed T&M tags are how extra work becomes billable.

    Contract administration

    RFI
    Request for information. A formal written question from the contractor to the design team when drawings or specifications are unclear, incomplete, or conflicting. RFIs are numbered, tracked, and often carry schedule impact if answers are slow. Free RFI log template.
    Submittal
    Product data, shop drawings, or samples the contractor sends to the architect or engineer for approval before fabrication or installation. The submittal log tracks each item's spec section, status, and review dates. Free submittal log template.
    Change order
    A signed contract amendment that changes the scope, price, or schedule. It typically begins as a PCO (potential change order) or COR (change order request) and becomes a change order once the owner approves it. Free change order log template.
    Cost code
    A numbered category used to charge labor, material, and equipment costs to a specific type of work, often based on the CSI MasterFormat divisions. Cost codes on timesheets are what make job costing meaningful.
    Substantial completion
    The point at which the owner can occupy or use the work for its intended purpose, even with punch list items outstanding. It usually starts warranty periods and stops liquidated damages.
    Retainage
    A percentage of each progress payment, commonly 5 to 10 percent, withheld by the owner until the project is complete and accepted.

    Safety and compliance

    JHA / JSA
    Job hazard analysis or job safety analysis. A task-by-task breakdown that lists each step of a job, the hazards in that step, and the controls used to eliminate or reduce them. Usually reviewed with the crew before high-risk work. Free JHA template.
    Toolbox talk
    A short, documented safety meeting held at the jobsite, typically 5 to 15 minutes, covering one hazard or topic relevant to the day's work. Attendance sign-in is the record that matters in an inspection. Toolbox talk guide.
    OSHA 300 log
    The federal form employers use to record work-related injuries and illnesses. Covered employers maintain it annually and post the 300A summary from February through April. Free OSHA 300 log template.
    Competent person
    An OSHA designation for someone capable of identifying existing and predictable hazards and authorized to take prompt corrective action. Required for excavations, scaffolds, and fall protection among others.
    SSSP
    Site specific safety plan. A written plan describing the hazards, controls, emergency procedures, and responsible personnel for one particular jobsite, usually required before mobilization. Free SSSP template.

    Schedule and production

    Critical path
    The longest sequence of dependent activities through a schedule. Any delay to an activity on the critical path delays the project completion date, which is why delay claims turn on critical path impact.
    Look-ahead schedule
    A short-interval schedule, commonly three weeks, showing the work each crew will perform. It is the working document for weekly coordination meetings.
    Float
    The amount of time an activity can slip without delaying the project. Activities on the critical path have zero float.
    Productivity rate
    Units of work installed per labor hour, such as square feet of drywall hung per hour. Comparing actual rates from daily reports against estimated rates is the fastest way to spot a job going sideways.

    Frequently asked questions

    Keep every one of these records in one place

    Daily reports, timesheets, RFIs, submittals, punch lists and safety documents, from any phone.

    14-day free trial · No credit card required to start · Cancel anytime

    Quick answer

    What are the core construction documentation terms?

    The documents that run a jobsite are the daily report (what happened today), the timesheet (who worked and on which cost code), the RFI (a question about the drawings), the submittal (product data sent for approval), the change order (an approved scope or price change), and the punch list (what still needs fixing before acceptance).

    Safety adds the JHA, the toolbox talk, and the OSHA 300 log. Every one of these is a record you may need years later, which is why contractors move them off paper.