    Free Concrete Pour Log Template

    The full placement record for one pour: every truck ticket with batch and discharge times, water added, slump, air and temperature, plus the cylinder sets and break dates that go to the lab.

    Download Free Excel TemplateDownload Print-Ready PDF
    Create a daily report

    14-day free trial. No credit card required

    Preview Template
    • No signup required
    • Excel and Google Sheets
    • Print-ready PDF included
    • 100% free
    Free concrete pour log template preview showing the printable jobsite layout
    DailyBuild_Free_Concrete_Pour_Log_Template.xlsx
    Download
    Free bundle

    Get all 30 construction templates

    Editable Excel files plus the paper-to-app checklist. Enter your email for the complete construction bundle.

    Instant download | One email list | Unsubscribe anytime

    What's inside the template

    Built from records that hold up when somebody asks.

    Pour header

    Location, date, mix design, supplier and placement method in one block.

    Truck tickets

    Ticket number, batch time, on-site time, discharge window and quantity per truck.

    Field tests

    Slump, air content, concrete temperature and ambient temperature, recorded per test.

    Cylinder sets

    Set ID, time cast, cylinder count, break dates and the testing lab.

    Discharge timing

    Batch to discharge times, so the 90-minute limit is visible rather than assumed.

    Placement notes

    Pre-pour checks, weather, finish, joint layout and curing method.

    What's included

    Two files, no signup, nothing locked.

    An .xlsx workbook you can edit and a formatted PDF you can print for the truck or the trailer wall.

    Excel workbook (.xlsx)

    Opens in Microsoft Excel, Numbers and Google Sheets. Edit every column and add your own.

    Print-ready PDF

    Landscape, fit to one page width, with sample rows you can clear before printing.

    Sample entries

    A few filled rows so the crew can see the level of detail expected, then blank rows to work in.

    Free to share

    Send it to your subs, your PM, or your whole company. No email address, no watermark.

    The short answer

    Concrete Pour Log Template: what it is and how to fill it out.

    A concrete pour log records one placement end to end: the mix design and supplier, each truck ticket with batch time, discharge time and quantity, the field tests (slump, air, concrete and ambient temperature), the cylinder sets cast with their break dates, and the finishing and curing method used.

    Why the ticket times matter

    Most specifications limit the time between batching and discharge, commonly 90 minutes or 300 revolutions unless the mix is designed otherwise. Logging batch time and discharge time on every truck is the only way to show the limit was met, and the only way to spot a truck that should have been rejected at the gate.

    Water added is the number everyone forgets

    Water added at the site changes the water-cement ratio and the strength that results. Record the gallons on the truck line, every time. If a cylinder breaks low, the first question asked is how much water went in, and a log that answers it turns an argument into a fact.

    Cylinders are useless without their record

    Note which truck each set was cast from, the time it was cast, and the break schedule (typically 7, 14 and 28 days with one held). A cylinder set that cannot be tied back to a specific truck and location cannot be used to accept or reject placed concrete.

    How to use it

    Four steps, start to finish.

    1. 1

      Fill the header before the first truck

      Location, mix design, supplier and placement method. Confirm the pre-pour checks are signed off.

    2. 2

      Log every truck

      Ticket number, batch and discharge times, quantity, water added, slump, air and temperature.

    3. 3

      Record the test sets

      Set ID, the ticket it came from, cylinder count, break dates and the lab.

    4. 4

      Close out the pour

      Total cubic yards placed, finish, joint cutting time and the curing method used.

    Before and after

    What changes once the record is consistent.

    Without a set format

    • Tickets in a pile with no times
    • Water added at the site untracked
    • Cylinder sets that match no truck
    • No record of curing or joint timing
    • Low breaks with nothing to check against

    With this template

    • Every truck timed and logged
    • Site-added water on the record
    • Cylinders tied to trucks and locations
    • Curing and joints documented
    • A complete placement record per pour

    Excel vs. DailyBuild

    When the spreadsheet stops keeping up.

    The template is free and it works. When the same record has to be captured every day, by several people, from the field, an app does it faster.

    CapabilityExcel TemplateDailyBuild Software
    Truck ticket log
    Slump, air and temperature
    Cylinder and break tracking
    Photos of the placement and tests
    Logged live from the pour
    Attached to the daily report
    Searchable by pour, area or date

    What changes when you switch

    • Weather fills itself in for every report
    • Crew hours flow straight into timesheets
    • One tap sends a branded, signed PDF
    Start Free Trial

    Ready to do this from your phone?

    Inside DailyBuild

    Daily reports in DailyBuild

    • Weather fills in automatically
    • Crew sign-off on every report
    • Branded PDF export in one tap
    Start Free Trial

    No credit card required to start your trial

    Frequently asked

    Concrete Pour Log Template FAQs

    Free iPhone and Android apps

    Run these logs from your phone

    The DailyBuild app turns the same daily report, timesheet and punch list into something your crew fills out on site - photos, hours and signatures included, with branded PDFs sent automatically.

    Download DailyBuild on the App StoreGet DailyBuild on Google Play
    DailyBuild mobile app Today screen with today's report, time, photo and safety actions

    Document the pour while the trucks are still rolling.

    Download the template free, or let DailyBuild capture the same record on your phone and email the PDF before you leave the jobsite.